about us              Employment    contact us   

 
 
  home    training   clients & projects   consulting     innovation   procurement   CAD
 
 
Our mission is to meet your needs by providing assistance tailored
towards achieving your project success
 
Clients and Projects
 
 

Alberta Government
Bantrel
Bechtel
City of Edmonton
Colt Engineering
Enform
EPCOR
Government of Nunavut
Lockerbie
Lorman
PCL
Suncor
Syncrude
TIC
University of Alberta
Worley Parsons


EPCORColt EngineeringWorley Parsons
Scheduling, Planning, Change Management, Risk Management, LDs Management & Performance Measurement for Keephills 500 MW Power Project

Setting-up the project plan. This includes Engineering and Construction Work Packages list, and building the schedule starting from level (I) to level (V). Developing change management and progress measurement tool to control project changes and performance. Establishing Risk and LDs management system.

Cost : $ 1.6 Billion



SUNCOR Energy

DBM Estimate, EDS Estimate and Schedule, and Cashflow Report for MNU Millennium Naptha Unit Project

Preparing class II estimate for EDS phase of the project after reviewing DBM estimate and their reconciliation. Building schedule, incurred cost to date and cashflow reports for EDS phase.

Cost : $ 650 Million


Controls of MCU Millennium Coker Unit Project
Tracking scope changes and trends, auditing staffing plan, progress, and performance, and track commodity progress curve

Cost : $ 2.1 Billion



WBS, Project Execution Plan, and Resources Plan for PSM - Procedures Project

Setting up Work Breakdown Structure (WBS), and work flow diagram. Preparing cost of services estimate, and stewardship project controls reports.

Cost: $ 90 Million



Cost and Time Management for Process Safety Information Project
Preparing Approvals for Expenditure (AFEs) and Contracts Work Authorization (CWAs) documents. Managing changes of estimate basis, and workflows.

Cost: $ 110 Million




Future Forecasting for Sewer Rehabilitation & Budgeting
Proactive Rehabilitative Infrastructure System Management (PRISM)
PRISM phase 4: A network and ORACLE based decision support system, the system utilizes the statistical analysis to develop deterioration curves to predict sewer future condition, then develop the best maintenance strategy
PRISM phase 3: The system utilizes statistical analysis to forecast for future rehabilitation funding
PRISM phase 2: A Personal Computer (PC) based system that predicts the sewer probability of failure



Training
- Construction Management, LORMAN Education Service
- Construction Contracts and legal issues, LORMAN
   Education Services



Training

•Contracts and Legal Issues, for ENFORM, funded by Petroleum industry, Canada
• Safety in Construction sites, for ENFORM, funded by Petroleum industry, Canada
• Quality Control, for ENFORM, funded by Petroleum industry, Canada


Applying Lean Simulation for Productivity Improvement of Drainage Maintenance

Measuring production cycle of drainage maintenance, and improve it using simulation techniques and lean construction approach.



 SUNCOR Energy
Electrical Protection Project, Electrical Substation Construction for the Millennium Project

Manage all work activities for three power supply projects for Oil and Gas Plants.
Duties include Project planning and scheduling, finalization of the design and layout drawing for all the projects in coordination with the engineers and consultants. Verify and approve completion certificates, as built drawings. Coordinating the consultants, subcontractors, and suppliers’ activities and time frame.
Investigate the completion of the Construction Work Packages; Organizing all procedures on and off site to ensure the project is completed on time and within the cost constraints set.

Cost:
$ 150 Million



 

Project Quality Management and Document Control for Froth Treatment Interconnecting Plant
Insured that the Engineering and Vendor drawings required for the Construction Work Packages (CWP) are in the best quality and according the projects standards. Coordinated the executing contractors to ensure the completeness of work performed in timely manners.

Cost: $500 Millions

 

Government of Alberta

Road Performance & Peterioration Prediction Modle

Devised models for to help predict the performances of roads and anticipate the annual needs for maintenance and improvement


Safety Performance & Evaluation

A feasability study to determin where should Alberta Infrastructure and Transportation invest in order to improve the over all safty of it's roads

An Examination of Driver Condition and Driver Actions in Traffic Collisions in Alberta

A demographic analysis for drivers to enhance and minimize collision rates


  
 

Productivity Improvement of Fabrication Shop

Setting up Work Breakdown Structure (WBS), and work flow diagram. Preparing cost of services estimate, and stewardship project controls reports.





Heavy Equipment Production Cycle Measurement using Image Processing for NREF Building

Measuring working cycle of heavy equipments applying Image processing techniques

Cost: $ 52.0 Million



Cost Control System

Developing cost control system using Access database to integrate labour and material cost with assigned code of accounts and WBS system.



Training

• Project Management, for Canada School of Public Services, Government of Nunavut, Canada
• Project Cost Control, for Canada School of Public Services, Government of Nunavut, Canada

 
   
cims 1624 Forbes Way, Edmonton – Alberta – Canada T6R-2P5 tel: +1 (780) 908-6746
© cims - 2007