DBM Estimate, EDS Estimate and Schedule,
and Cashflow Report for MNU Millennium Naptha Unit
Project
Preparing class II estimate for EDS phase of the
project after reviewing DBM estimate and their reconciliation.
Building schedule, incurred cost to date and cashflow
reports for EDS phase.
Cost : $ 650 Million
Controls of MCU Millennium Coker Unit
Project
Tracking scope changes and trends, auditing staffing
plan, progress, and performance, and track commodity
progress curve
Cost : $ 2.1 Billion
|
|
WBS, Project Execution Plan, and Resources
Plan for PSM - Procedures Project
Setting up Work Breakdown Structure (WBS), and work
flow diagram. Preparing cost of services estimate,
and stewardship project controls reports.
Cost: $ 90 Million
Cost and Time Management for Process Safety
Information Project
Preparing Approvals for Expenditure (AFEs) and Contracts
Work Authorization (CWAs) documents. Managing changes
of estimate basis, and workflows.
Cost: $ 110 Million
|
|

Future Forecasting for Sewer Rehabilitation
& Budgeting
Proactive Rehabilitative Infrastructure System
Management (PRISM)
PRISM phase 4: A network and ORACLE
based decision support system, the system utilizes
the statistical analysis to develop deterioration
curves to predict sewer future condition, then develop
the best maintenance strategy
PRISM phase 3: The system utilizes
statistical analysis to forecast for future rehabilitation
funding
PRISM phase 2: A Personal Computer
(PC) based system that predicts the sewer probability
of failure
|
|

Training
- Construction Management, LORMAN Education Service
- Construction Contracts and legal issues, LORMAN
Education Services
|
|

Training
•Contracts and Legal Issues, for ENFORM, funded
by Petroleum industry, Canada
• Safety in Construction sites, for ENFORM,
funded by Petroleum industry, Canada
• Quality Control, for ENFORM, funded by Petroleum
industry, Canada
|
|
 
Applying Lean Simulation for Productivity Improvement
of Drainage Maintenance
Measuring production cycle of drainage maintenance,
and improve it using simulation techniques and lean
construction approach.
|

Electrical Protection Project, Electrical
Substation Construction for the Millennium Project
Manage all work activities for three power supply
projects for Oil and Gas Plants.
Duties include Project planning and scheduling, finalization
of the design and layout drawing for all the projects
in coordination with the engineers and consultants.
Verify and approve completion certificates, as built
drawings. Coordinating the consultants, subcontractors,
and suppliers’ activities and time frame.
Investigate the completion of the Construction Work
Packages; Organizing all procedures on and off site
to ensure the project is completed on time and within
the cost constraints set.
Cost: $ 150 Million
|

Project Quality Management and Document Control
for Froth Treatment Interconnecting Plant
Insured that the Engineering and Vendor drawings required
for the Construction Work Packages (CWP) are in the
best quality and according the projects standards. Coordinated
the executing contractors to ensure the completeness
of work performed in timely manners.
Cost: $500 Millions
|
|
|
|
Road Performance & Peterioration
Prediction Modle
Devised models for to help predict the performances
of roads and anticipate the annual needs for maintenance
and improvement
Safety Performance & Evaluation
A feasability study to determin where should Alberta
Infrastructure and Transportation invest in order to
improve the over all safty of it's roads
An Examination of Driver Condition and Driver
Actions in Traffic Collisions in Alberta
A demographic analysis for drivers to enhance and minimize
collision rates
|
|
|


Productivity Improvement of Fabrication Shop
Setting up Work Breakdown Structure (WBS), and work
flow diagram. Preparing cost of services estimate,
and stewardship project controls reports.
|
|

Heavy Equipment Production Cycle Measurement
using Image Processing for NREF Building
Measuring working cycle of heavy equipments applying
Image processing techniques
Cost: $ 52.0 Million
|
|

Cost Control System
Developing cost control system using Access database
to integrate labour and material cost with assigned
code of accounts and WBS system.
|

Training
• Project Management, for Canada School of
Public Services, Government of Nunavut, Canada
• Project Cost Control, for Canada School of
Public Services, Government of Nunavut, Canada
|
|
|